Join Dragados and Flatiron on the CaliforniaHigh-Speed Rail Construction Package 2-3 Project.
The CP 2-3 Team recognizes the vital and productive role Small and Disadvantaged Businesses perform on projects of this scale and is committed to utilizing local and specialty subcontractors for a variety of tasks pertaining to project controls, construction, quality control and material supply.
- Network with DFJV
- Certification Assistance
- Current Bid Packages
- Project Information
Visit us at www.dfcp23.com
FOR MORE INFORMATION
DFJV Small Business Officer
SmallBusiness@dfcp23.com
Abbigail Brown
Small Business Consultant
abbigail@cpmlogistics.net
510.978.4300